Primavera

Primavera is an elite, extensive, multi-task arranging and control program. Primavera offers some sort of advantages with portfolio related to commercial enterprises. It has huge number of approaches to arrange, channel and sort exercises, activities, and assets.

Venture administrations related to civil, mechanical and electrical designing can be managed with this software tool. Experts who are proficient in venture administration abilities and systems can utilize Primavera to advance readiness and efficiency in associations.

 

Prerequisites: –
  • Can access computer system and make use of internet to perform search over Google.

 

Need to Prepare?
  • Prior programming experience is not required. Basic knowledge of Civil Engineering with design concepts will be appreciated.

 

Tools Expected: –
  • Windows OS based PC, Smart phone with Internet, Notebook and Pen

 

Tools Used (for the session): –
  • Sample Codes, Software, PPTs, Reference Materials

 

Concepts:-

Work Breakdown Structure, Adding Activities, Creating Relationships and Scheduling, Assigning Resources and Costs, Analyzing Resources, Project Execution and Control

 

Summary:-

This workshop will address about the navigation, functionality, planning and scheduling with Primavera P6. Scheduling techniques and best practices will be also covered.

 

Highlights & Practical Experiences:-
  • Introduction to Primavera P6
  • Learn about Data, Navigation and Layouts
  • Enterprise Project Structure
  • Creating a Project/WBS
  • Adding Activities/Relationships/Scheduling/Constraints
  • Project Documents Library
  • Roles and Resources/ Assigning resources & Costs
  • Analyzing Resources/ Optimizing Plans
  • Base lining the Project Plan
  • Learn about Project Execution and Control
  • Reporting Project Performance

 

Commitment:-

2 Days (7 hours each including 1-hour lunch break)

 

Agenda:-
Day 1
Session 1-  (03:30 hrs)
Primavera Induction:
  • Motivation of Planning
  • Project planning matrices
  • Project management life cycle
  • Enterprise project structure
  • Work breakdown structure
  • Organizational breakdown structure.

 

Project Documents Library(Planning, Monitoring & Scheduling):
  • Creating projects, calendars, activities, logic link, scheduling, critical path, total float, free float, constraints, baseline, tracking.
  • Creating and using resources
  • Creating and using roles, budgets, resources usage profiles,
  • Optimization of resources.

 

Session 2- (02:30 hrs)
Creating a Project/WBS:
  • Creating blank project
  • Copy an existing project
  • Importing project
  • Setting up a new project
  • Database default calendar
  • Accessing global and project calendar
  • Editing calendar working days and hours
  • Wbs node separator,
  • Wbs categories
  • Adding activities under wbs
  • Default activity duration
  • Bars in Gantt chart
  • Assigning calendar to activities
  • Assigning to a wbs node.

 

Session Recap

Day 2
Session 1- (03:30 hrs)
Adding Relationship, Scheduling and Constraints:
  • Adding relationship, lags and leads
  • Graphically adding or removing relation
  • Circular relationship,
  • Scheduling the project
  • Assigning the constraints, activity notebook, activity network view, group sort & layouts, filters, printing & reports.
  • Sata fields
  • Start & Finish (Early, Late & Actual)
  • Scheduling options: Ignore relationships to & from other projects, Open ended activities as critical, expected finish dates, Automatic when changes affect dates, Level Resources.

 

Base lining the project plan
  • Creating and Deleting a baseline
  • Restoring a baseline to the database
  • Update baselines
  • Updating activities using status tab and columns
  • Progress spotlight and update progress
  • Comparing progress with baseline.
Session 2- (02:30 hrs)
Roles and Resources/ Assigning resources and Costs:
  • Creating roles
  • Creating individual and group resources
  • Assigning resources and roles
  • Activity usage spreadsheet
  • Activity usage profile
  • Resources usage spreadsheet
  • Resources usage profile
  • Resources leveling.
  • Recalculate resource costs after scheduling

 

Case Study: residential apartment and industrial project.
Session Recap
Zonal Round of SkillThon
  • Competition
  • Certificate distribution and acknowledgement

 

Charges:

INR 1100 (GST exclusive) Per Participation